If you’ve ever watched a high-volume manufacturing line produce small, precision screw components—like the ones that keep consumer electronics assembled or medical devices calibrated—chances are a 4 combination screw mold played a critical role. At my shop, we specialize in designing and manufacturing these molds for clients across automotive, medical, and consumer goods sectors, and one of the most misunderstood steps in our process is heat treatment. Too many first-time clients assume a mold’s quality hinges solely on its initial tool steel choice, but heat treatment is where a raw block of metal transforms into a part that can withstand millions of injection molding cycles without warping, cracking, or wearing thin. Today, I want to walk you through exactly how we heat treat a 4 combination screw mold, why each step matters, and what it means for your production runs. 4 Combination Screw Mold

First, let’s ground this in what a 4 combination screw mold actually is, because it’s not a single component—it’s a set of four interlocking, precision-machined inserts that form the external threads of a screw. Unlike a standard mold that might produce a single cavity, each insert in our 4 combination mold has a complementary thread profile, so when they fit together and close around the core rod, they shape a full screw in one injection cycle. That design means every surface has to be perfectly uniform: a single micron of misalignment in heat treatment can throw off the thread pitch, leading to screws that won’t mate with their intended fasteners. We work primarily with H13 tool steel for these molds—it’s the gold standard for mold making, thanks to its high toughness, wear resistance, and ability to handle repeated thermal cycling. But even H13 is raw when it arrives, so heat treatment shapes its properties.
The first step in our heat treatment process is pre-heat preparation, and it’s non-negotiable for 4 combination molds. These inserts have thin, intricate thread forms—some as small as M2.5, with thread roots barely 0.1mm wide—so we can’t rush heating. If we toss a cold mold into a high-temperature furnace, the outer layers will expand faster than the internal core, causing thermal stress that leads to cracking. For our shop, pre-heat happens in two stages: first, we slowly bring the mold up to 400°C over three hours in a controlled atmosphere furnace (we use nitrogen to prevent oxygen from oxidizing the steel’s surface, which would weaken it), then we hold it at that temperature for two more hours. The second pre-heat stage brings us up to 850°C, again over three hours, with a two-hour hold. This gradual heating eliminates thermal gradient stress, a common failure point in molds with complex geometries. Last year, a new client tried to skip one of these pre-heat stages on a 12-cavity mold (similar complexity to a 4 combination, just more cavities) and ended up with three cracked inserts mid-production run, costing them $12,000 in downtime. That’s the kind of mistake we build our process to avoid.
Next is the austenitization stage, where the steel’s internal structure transforms. For H13 tool steel, this means heating the mold to 1020°C, and it’s here that precision timing is everything. We don’t just hold the mold at temperature for a set time—we monitor the temperature of each individual insert, because even a 10°C difference between the thick base of the insert and the thin thread section can create uneven hardness. For a 4 combination screw mold, that means we use multiple thermocouples: one at the insert’s core, one at its mid-height, and one at the very tip of the thread profile. We hold at 1020°C for 20 minutes per inch of insert thickness, so a 2-inch insert gets 40 minutes, and a 1-inch insert gets 20. That ensures every part of the steel reaches the same austenitic structure, where carbon is evenly distributed, ready to harden. If we hold too long, the steel becomes grainy and brittle; too short, and it won’t harden uniformly. We learned this the hard way in 2021, when we ran a batch of 10 4 combination molds and only held the thickest inserts for the required time—three weeks later, two clients reported thread wear after 500,000 cycles. That taught us to adjust our timing algorithm for each insert’s unique geometry, not just a one-size-fits-all formula.
After austenitization comes quenching, the step that turns soft austenite into hard martensite. This is another point where generic processes fail for 4 combination screw molds. Most mold shops use oil quenching, but oil can cause uneven cooling, especially for delicate thread forms. Instead, we use high-pressure gas quenching (HPGQ) with pure nitrogen at 10 bar pressure. Why nitrogen? It’s inert, so it doesn’t react with the steel, and it delivers a consistent cooling rate across every surface of the insert. For our 4 combination molds, we cool the furnace chamber at a rate of 5°C per minute until the mold reaches 60°C, then we hold it there for one hour before removing it. Oil quenching would cool the outer layers of the mold much faster than the core, leading to distortion in the thread profiles—something that would require grinding to fix, adding days of work. With HPGQ, distortion is almost negligible; we typically see less than 0.02mm of movement across the entire insert, which is critical for maintaining thread pitch. I remember a client from a medical device company coming to us after using a competitor’s mold, whose oil-quenched 4 combination inserts had 0.15mm of distortion—enough to make their screws fail a mating test with their plastic housings. We re-heat treated their molds with HPGQ, and their defect rate dropped from 8% to 0.01%. That’s the impact of choosing the right quenching method.
Once quenching is done, the mold is hard—rockwell C hardness around 58-60, which is great for wear—but it’s also stressed and brittle, with internal tensions that will cause it to crack during the first production run. That’s where tempering comes in, and it’s the step that makes H13 tool steel suitable for long-term mold use. Tempering is simply reheating the mold to a temperature below its austenitization point to reduce those internal stresses and adjust hardness. For our 4 combination screw molds, we use a two-stage tempering process, not just one. First, we heat the mold to 550°C, hold it for four hours, then cool it to room temperature. Then we repeat the process at 580°C, holding for another four hours. Why two stages? Because H13’s optimal hardness for injection molding is 54-56 HRC, and a single temper at 580°C would leave the steel too soft (around 52 HRC), while a single temper at 550°C would leave it too brittle, prone to chipping when the mold closes under high pressure. The second temper at 580°C balances hardness and toughness, giving the mold the ability to withstand millions of cycles without wearing out its thread forms. We also test every mold’s hardness after tempering with a portable rockwell tester; if an insert is off by even 1 HRC, we send it back for a third temper. Last year, a client running automotive fasteners needed their molds to last 2 million cycles—our two-stage tempered molds hit that mark, while a competitor’s single-stage molds failed at 1.2 million. The difference wasn’t the material, it was the tempering process.
After tempering, we do a final stress relief, a step that many shops skip but that we consider non-negotiable for 4 combination molds. Even after quenching and tempering, there are tiny residual stresses from machining and heat treatment that can cause distortion over time, especially during the first few production runs. We put each insert back into the furnace at 200°C, hold it for two hours, then slowly cool it. This step is quick, but it eliminates any remaining stress that might affect the mold’s dimensional stability. We once had a client who skipped this step on a 4 combination mold for toy screws; after 10,000 cycles, the thread profiles shifted, leading to 15% defective products. Adding the stress relief added only 8 hours to our process, but it cut their defect rate to near zero. It’s one of those small, often overlooked steps that separates a reliable mold from one that causes headaches.
Now, let’s talk about how all this heat treatment translates to real-world value for you, the client. When you order a 4 combination screw mold from us, the heat treatment process doesn’t just make the mold hard—it ensures your screws are consistent, your production runs are long, and your downtime is minimal. For example, a medical device client we work with needs screws for insulin pumps that have to be perfectly uniform to avoid jamming; our heat treated molds produce screws with a thread pitch tolerance of ±0.001mm, meeting their strict FDA requirements. An automotive client needs screws that can withstand 2 million cycles under high vibration; our two-stage tempered molds hold up, so they don’t have to replace molds every six months.
I know that for many buyers, heat treatment is a “black box”—you order a mold, and you assume it’s been properly processed. But as someone who’s been in the mold making business for 12 years, I’ve seen too many cheaply made molds cut corners on heat treatment, leading to higher costs for the client. Skipping pre-heat means cracking, skipping HPGQ means distortion, skipping two-stage temper means brittleness. It’s not just about the cost of the mold; it’s about the cost of downtime, defective products, and lost revenue.
If you’re in the market for a 4 combination screw mold, don’t just look at the initial price. Ask about the heat treatment process: what tool steel do you use, how do you handle pre-heating, quenching, and tempering? A reputable supplier will walk you through their process, because they know it’s the foundation of a quality mold.

If you’re ready to talk about a 4 combination screw mold for your specific application—whether it’s for automotive fasteners, medical devices, consumer electronics, or any other sector—I’m here to help. We work with clients of all sizes, from small startups to large manufacturing firms, and we tailor our heat treatment and mold making process to meet your unique needs. Don’t hesitate to reach out to discuss your project, ask questions about our process, or get a quote for your mold.
Stamping Parts References:
- Astakhov, V. P. (2006). Metal Cutting Science and Applications. CRC Press.
- Dieter, G. E. (1986). Mechanical Metallurgy (3rd ed.). McGraw-Hill Education.
- Tool Steel Institute. (2019). Heat Treatment of H13 Tool Steel: Industry Best Practices. Tool Steel Engineering Journal.
- Kubelka, J., & Vojtek, M. (2020). Distortion Control in Complex Injection Molds via Optimized Quenching Processes. Journal of Manufacturing Processes.
Zhanci Hardware Products Co.,Ltd
Zhanci Hardware is one of the most professional 4 combination screw mold manufacturers and suppliers in China, proviDINg bulk new design products for sale. Welcome to wholesale high quality 4 combination screw mold in stock at cheap price from our factory. for customized and OEM services, contact us now.
Address: NO.5 BUILDING SHUOYI INDUSTRIAL PARKJINGLONG VILLAGE, ZHENLONG TOWN HUIZHOU, 516227 GD,CHINA
E-mail: hzzhanci@vip.163.com
WebSite: https://www.clichnuts.com/